Mashing is the process of combining the milled grain and hot water, heating this mixture to different
temperatures to achieve step mashing in a vessel called a "mash tun".
We get mash after step mashing. The mash will be pumped to lauter tank to process mash lautering
until the wort is clear.
To save lautering time, there will have buffer tank between lauter tun and kettle tank.
The clear wort will be transferred from buffer tank to Kettle tun for wort boiling and hop adding.
After 1-1.5 hour wort boiling, the wort will be pumped to Whirlpool tank for whirlpooling,
forcing the denser solids (coagulated proteins, vegetable matter from hops) into a cone
in the center of the Whirlpool tank. After Whirlpooling, wort will be cooled immediately
by heat exchanger and go to fermenter for fermentation.
BME-60BBL
Brewman
8438400000
Availability: | |
---|---|
| |
Product Description
60 bbl Best 5 Vessel Brewhouse Equipment Design Manufacturers
60 bbl brewhouse Introduction:
60 bbl Best 5 Vessel Brewhouse Equipment Design Manufacturers
that is focus on regional market. The capacity request is not so high than micro breweries.
Their beers are always sold on shelf in bottle or canning.
5 vessels brewhouse includs Mash tun, Lauter tun, buffer tank, Kettle tun and Whirlpool tun.
This design is mostly used for large commercial breweries to do continuous brew per day.
The complete setup of these breweries is in compliance with modern brewery standards and specifications.
These products enable systematic execution of milling, mashing, fermentation, filtration, filling
and other related processes.
We subject each brewing system to stringent testing procedures before launching them in the market.
Work Process for 5 vessel brewhouse :
Mashing is the process of combining the milled grain and hot water, heating this mixture to different
temperatures to achieve step mashing in a vessel called a "mash tun".
We get mash after step mashing. The mash will be pumped to lauter tank to process mash lautering
until the wort is clear.
To save lautering time, there will have buffer tank between lauter tun and kettle tank.
The clear wort will be transferred from buffer tank to Kettle tun for wort boiling and hop adding.
After 1-1.5 hour wort boiling, the wort will be pumped to Whirlpool tank for whirlpooling,
forcing the denser solids (coagulated proteins, vegetable matter from hops) into a cone
in the center of the Whirlpool tank. After Whirlpooling, wort will be cooled immediately
by heat exchanger and go to fermenter for fermentation.
60 bbl brewhouse for sale Shipping:
.Plastic film wrapped and iron frame fixing for FCL(full container loading)
20’GP, 20’HQ, 40’GP, 40’HQ,45’GP,45’HQ,
.Wooden case package for LCL(less container loading) and flat shipping
60 barrel brewhouse Configuration:
General specification for 60 barrel brewhouse profits: | ||||
No. | Name | Components | Capacity | Specification |
1 | Grain Milling Unit | Rolling Miller | 2000kg/hr | Double roller |
Power:1.5Kw | ||||
Noise:45±3db | ||||
2 | Brewhouse Unit | Mash tun | 60 bbl | Grist hydrator |
Agitator with VFD | ||||
Lauter tun | 60 bbl | Side mounted grain outdoor with grain chute | ||
Laser cutting V-wire False Bottom | ||||
Buffer tank | 60 bbl | |||
Kettle tun | 60 bbl | Steam condenser/exhaust pipe | ||
Sanitary leveling sight glass | ||||
Whirlpool Tun | 60 bbl | Tangential whirlpool inlet | ||
Sanitary leveling sight glass | ||||
Hot water tank | 120 bbl | Sanitary leveling sight glass | ||
Yeast feeder | 200L | Tri clamp aeration port with ball valve | ||
Heat exchanger | 2 x35M2(Effective area) | Completely 304 SS Corrugated plates | ||
YUY pump | 15M3x5PCS | ABB, Sanitary SUS304, VFD control | ||
Pipe and fittings | As design | completely SS304, Work Platform is included | ||
3 | Fermentation unit | Fermenter | 120 bbl | Dimple cooling jacket on cone and bottom |
Side manway | ||||
Tri clamp CIP ball | ||||
60 degree cone bottom | ||||
Perlick style full sanitary sampling valve | ||||
Carbonation port and level tube for special request | ||||
5 | Bright beer tank | Bright beer tank | 120 bbl | Dimple cooling jacket on cone and bottom |
Level tube for checking | ||||
Tri clamp CIP ball | ||||
Side manway | ||||
Perlick style full sanitary sampling valve | ||||
Carbonation port with tri clmap carbonation stone | ||||
6 | Glycol Chilling Unit | Glycol Water Tank | 120 bbl | Insulated conical top and sloped bottom |
Chiller | 25HPx2PCS | Cooling Capacity: 15400Kcal/8HP | ||
Installed Power:7.8kw | ||||
Refrigerant: Freon R404A ,R410A | ||||
Noise:70-80db | ||||
Coperland compressor | ||||
PVC pipe | As designed | Solenoid valves for glycol inlet to tanks are included | ||
Glycol water pump | 5M3x2PCS | Sanitary SUS304, VFD control | ||
7 | Control unit | Brewing and fermetation process Controlling | Floor type | PLC control with touch screen for special |
PC or mobile remote control for special request | ||||
8 | CIP | Caustic Tank | 2000L | electric heating element inside, With bimetal thermometer |
Sterilization Tank | 2000L | H2O2 | ||
Pump | 5M3 | YUY, VFD control | ||
12 | Others | Option | Can be Customized | Auger System |
Grain Case | ||||
Grist Hydrator | ||||
Piping flow panel for Brewhouse | ||||
Brewhouse Separate PLC Controller |