Views: 0 Author: Brewman Publish Time: 2022-07-16 Origin: Site
400l Burner Direct Fire Heating Brewery Equipment In Australia
This 400l Burner Direct Fire Heating Brewery Equipment is located at Sydney, Australia.
The owner Lyntton is so good man and he is very professional in beer brewing.
It is very honor for us to have a chance to built his 400l brewery in 2022.
Please review this project with Brewman and share with us your ideas and suggestions.
Part I: Brewery starting consulting, proposal communication via email and call.
During this process, we confirm the specification and configuration of brewery system:
The main configurations mainly include:
400L 2Vessels Brewhouse+HLT (MLT+KWT+400L HLT)
Turbine Flow Meter
Extra Chimney with Flange plate
400L Fermentation Unitank with Spunding Valve & Carbonation Stone
800L Fermentation Unitank with Spunding Valve & Carbonation Stone
Pig Tail for Sample Valve
20L Yeast Feeder
φ38mm Y-shape Adaptor
φ38mm Sight Glass
800L Glycol Water Tank
PPR Pipelines,Glycol Pumps,PPR Fittings, Glycol Solenoid Valves
Combined Brewhouse and Fermentation Controlling Panel
100L CIP Unit (Two Tanks on Cart)
4Heads Simple Keg Filling Machine with Type D Keg Coupler
A-type Beer Coupler
2-station Manual Keg Washer
Part II: 400L brewery system layout, 2D and 3D drawing design before manufacturing
As the brewery have a space limitation, so we design the brewing tank and fermentation tank slim and tall to make sure it can fit in the space.
Floor plan for 400l beer brewing system
400l brewery beer system 3D drawing and pipeline connection
Part III: Manufacturing of 400l brewery beer equipment
Burner combustor for kettle whirlpool tank
Part IV: Finish of 400l brew beer equipment
400l brew beer equipment brewhouse, 2 vessels brewhouse mash lauter tank, kettle whirlpool tank
Brewery controller
400L and 800l jacketed fermentation tank with spunding valve, carbonation stone and levels
Manual diaphragm valve for mixing hot water and cold water
Electric elements in hot water tank
Grain scraper
Yeast feeder 20l with special design( bimetal thermometer, pressure gauge)
Manual keg filler device for 400l beer brewing equipment
Part V: Shipping of 400l brewing beer equipment
All brewery system are loaded and shipped in one 20feet container.
Part IV: 400l beer brewery system Installation in Australia
Part V: first batch beer.
Part VI: hops farm, looks so nice
If you also want to realize your brewing dream, come and visit Brewman factory.
Thanks and welcome your inquiry.